Skip to content

Metro Matrix

  • Canada
  • International
  • Toronto
  • Staff
    • Sam Greenwood

Tag: Line 5

TorontoLeave a comment

The Crosstown at 30 Days: A Tale of Two Railways

05/25/202609/02/2026 Sam Greenwood

After a decade of construction, the Eglinton Crosstown is finally moving passengers. One month in, the line is a study in contrasts—offering high-speed underground travel alongside frustrating surface delays and curious design choices. Here is a look at what’s working and what still needs fixing. Continue reading The Crosstown at 30 Days: A Tale of Two Railways

Proudly powered by WordPress Theme: Gazette by Automattic.